Opening
1 min · 1 slides
Opening
1
Build Smarter, Not Harder
Pre-Hackathon Prep
5 min · 5 slides
Pre-Hackathon Prep
2
Pre-Hackathon Prep
3
Define Your MVP in One Line
4
The 3-Tier Feature System
5
Brand & UX Prep
6
Reusable Context Doc
Navigate the Build
4/8
9 min · 8 slides
Navigate the Build
7
Navigate the Build
8
Work Backwards from Deadline
9
Approach 1 — Sequential
10
Approach 2 — Time-Boxed Chunks
11
Test as You Build
12
Common Pitfalls
13
Resume Work Protocol
14
Emergency Pivots
Lovable Superpowers
4 min · 4 slides
Lovable Superpowers
15
Lovable Superpowers
16
How to Talk to Lovable
17
Chatbox — 3 Dimensions
18
Quick Setup — 3 Clicks
Demo & Submission
2.5 min · 2 slides
Demo & Submission
19
Demo & Submission
20
Pitch Planning & Recording
Closing
0.5 min · 2 slides
Closing
21
The Toolkit
22
Final Thought
Slide 10 / 22
2.2 Task Management · Approach 2 · Recommended
Time-Boxed Chunks
Match the task to the slot — so you never start something you can't finish.
60-min
A new page or feature end-to-end
e.g. Search page, profile page, settings flow
30-min
A single component or section
e.g. Navbar, a card, test one user flow
15-min
Tweaks
e.g. Copy, color, spacing, small fixes
💡 If a 30-min task isn't done in 45 min, it's either a 60-min task or needs to be split.
Replan
.
←
10 / 22
→
⊞
⛶